RESTORATION LOCAL
eProjecta signs the commission for the design, management and legalization of a 400 m² restaurant in the tourist area of Vilanova i la Geltrú.
- Tipología:
- Projects
- Categoría:
- Featured home
eProjecta signs the commission for the design, management and legalization of a 400 m² restaurant in the tourist area of Vilanova i la Geltrú.
2 August 2018
eProjecta has signed a contract with a school in Sabadell to carry out an extension of the electrical installation of air conditioning and he existing heating installation of the school’s old building.
2 August 2018
Eprojecta has signed the contract to be the technical office in charge of carrying out all the necessary procedures to obtain the temporary license for the 21st Mediterranean Fair that will be held in Manresa.
16 May 2018
eProjecta has signed a contract to be the technical office responsible for the design and control of execution of 3 detached single-family housing with community garage located in the town of Masnou.
16 May 2018
eProjecta has been the chosen engineering to describe the installation and operation of the musical event that will take place on May 25th at the subsequent parking of the Palau Firal de Manresa in the occasion of the celebration of the 75th anniversary of the Polytechnic University of Catalonia of Manresa.
15 November 2018
Work begins on the construction of an industrial warehouse for the manufacture of chemical products in the Pla del Mas de Sallent industrial estate. eProjecta is the engineering company in charge of carrying out the entire technical project and also the project management of the work.
15 June 2021
Interior reform works in a house in the Sagrada Familia in Barcelona where the structure of the building is modified and we create new spaces.
4 June 2021
New job! Eprojecta is the company that the Official College of Industrial Technical Engineers of Manresa (CETIM) entrusts to carry out a technical project for the assembly of a monument in honor of Mrs. Rosa Argelaguet Isanta, engineer and director of the Manresa Higher School of Engineering (EPSEN) of the Polytechnic University of Catalonia (UPC) […]
16 April 2019
Eprojecta has processed all the documentation to obtain the license of a terrace in a bar located in the district of Sant Gervasi in Barcelona.
20 November 2018
The financial entity Caixabank once again relies on the Eprojecta team to carry out the project to obtain electricity in the Store offices that will be opened in different municipalities, as well as to inform the industry services of the Generalitat.
19 April 2018
The President Amat Roumens Foundation (FUPAR) is a non-profit social economy entity that was created to give continuity to the process of training and social and occupational inclusion to adults with functional diversity. From eProjecta we have legalized the low voltatge electrical installation of the special work center, the generator set of complementary supply to […]
18 April 2018
The transport company of goods and storage of products Transports Peva, SL, has entrusted the equipment of eProjecta to carry out the legalization of a storage facility of gas oil of own use formed by a deposit and two gas-oil generators A, following Royal Decree 706/2017, of July 7, which approves the complementary technical instruction […]
22 December 2017
Different companies of an industrial or commercial nature rely on the eProjecta team to carry out the processing of the pertinent authorizations to legalize the activity of the company, as well as the Previous communication of activity opening. Some of the last legalizations carried out have been in retail shops of non-specialized food and drinks, […]
Gracias, hemos recibido tu comentario.