5 May 2016
We have been selected by the construction company for the implementation of the control of the work of internal reform of a restaurant of 250 m2 in the Nou Barris district of Barcelona.
5 May 2016
Since the start of the economic crisis and the lowering of the residential building sector, which had an important weight in the our portfolio of projects, the objective of the company was to enter the field of sporadic extraordinary activities, building on the momentum of the tourism market in the city of Barcelona. After 6 […]
5 May 2016
From eprojecta we are working together with the faculty of the school to renew and improve the security plan to ensure the management of the emergency.
18 April 2016
Eprojecta begins the design of the facilities of a company located in Girona capital. The project corresponds to the design of the new offices of the company, the warehouse area in height and the space of logistics and distribution. The area occupied is about 1200 m2.
2 January 2016
eprojecta has renovated for this 2016 the 100% of the service contracts of technical advice for the Public Administration. These contracts make reference to buildings, Associations and Public Administrations.
16 October 2015
After the Repsol service station in the Parc Vallés of Terrassa, eprojecta performs the reform of all the facilities of the gas station of the population of Puig-reig. The works include the urgent intervention to remedy the state of abandonment of the station (closed the last years) and the design and legalization of all the […]
14 October 2015
We are planning the implementation of a new trade in Manresa. This is a new center of self-service laundry room through last generation equipment, which guarantee a professional result with the use of biodegradable products.
16 September 2015
We repeat for one more year as the technical office in charge of the legalizations to level of Catalonia. We take upon from the security of any removable structure until the security plan of Catalan level, through the temporary facilities for electrical supplies.
7 August 2015
We are developing a Self-Protection Plan according to Decree 30/2015 of an activity classified at Catalan level.
6 August 2015
We are legalizing the facilities of a brine treatment plant in the Súria mine by the Bages excavation company. It is scheduled to be launched this August